Solar Installation and Support Services Across Pakistan
Japston Energy installs solar systems across Pakistan to reduce daytime grid use. We also help plan battery backup for essential appliances and maintain existing installations. Share your electricity bill, location and power needs to discuss the right service.

Our Lahore offices support projects for homes, businesses, factories and farms. You can contact us for a new installation, a battery upgrade, application support or help with an existing system.
At our Wapda Town project in Lahore, we installed 18 LONGi panels rated at 645 watts each. These connect to a GoodWe hybrid inverter rated at 12 kilowatts (kW).
The combined panel rating is 11.61 kW. Your quotation should distinguish panel capacity, inverter capacity and battery storage just as clearly. That starts with understanding your property and electricity use.

Site Assessment and Solar System Planning
As a solar installation company serving Pakistan, Japston Energy starts with your usage, roof conditions and installation requirements. A home needing evening backup requires a different design from a business using most electricity during working hours.
A site assessment covers available space, shading, roof condition, access and equipment locations. It also helps establish mounting requirements and cable routes before equipment is selected.
Share the appliances or machinery you use, their operating hours and any planned additions. For agricultural installations, include pump details and irrigation schedules. These details help define the system capacity and installation scope.
Explore this serviceSolar Panel Installation Service
Our solar panel installation service brings together equipment supply, mounting, wiring, inverter setup and system testing. We provide rooftop solar installation in Lahore and coordinate residential, commercial and industrial projects across Pakistan.
The installation scope should identify the panel layout, mounting structure, cable specification and electrical protection. It should also explain the inverter location, earthing arrangements and any roof work needed before installation.
For larger projects, our Engineering, Procurement and Construction (EPC) services bring design, equipment procurement and construction into one agreed scope. Discuss site access, working hours and commissioning requirements before work begins.
At commissioning, the system needs checks for electrical connections, inverter settings and monitoring. The handover should explain normal operation, fault alerts and how to request after-sales support.
The next decision is whether you need daytime generation alone or power for selected appliances during outages.
Explore this serviceSolar Battery Backup System Installation
A solar battery backup system needs to match the appliances you want to run and the backup duration you require. Share your essential loads first, including any refrigerator, water pump or air conditioner you want assessed.
Battery storage is measured in kilowatt-hours (kWh). Inverter capacity is measured in kW. Usable battery capacity, appliance demand and system losses affect backup time. The inverter must also support the starting demand of connected equipment.
We help plan hybrid solar systems with compatible battery storage. Discuss lithium battery options, installation space and backup circuits when requesting your quotation.
If you want to add battery backup to an existing solar system, send the inverter model and current system details. Battery compatibility and the required wiring changes need checking before an upgrade is priced.
A standard on-grid solar installation normally shuts down during a grid outage. Backup requires suitable equipment and configuration. Confirm which appliances the proposed system will support before installation.
Explore this serviceSolar Net Metering and Net Billing Application Support
For solar net metering service enquiries, contact our team with your city, electricity provider and proposed system capacity. If you have already applied, include your application reference and the stage reached.
New applications follow the current net billing framework. Imported electricity and exported solar energy are valued separately. For existing connections, the agreement and current rules need review before estimating export credits.
Discuss eligibility checks, document preparation, system drawings and inspection readiness as part of your project scope. Confirm which application tasks are included in your quotation and which require action from you.
The electricity distribution company and regulator handle the required approvals. Meter arrangements follow the electricity provider’s process. Official charges and application support fees should be identified separately.
Explore this serviceSolar Panel Maintenance Service
Contact Japston Energy when your system shows lower output, repeated inverter alerts or changes in battery performance. Share the equipment model, alert message and recent monitoring records so the issue can be assessed.
Our solar panel maintenance service can include performance checks and inspection of wiring, connections and mounting structures. Discuss panel cleaning and inverter servicing requirements when requesting a maintenance visit.
Lower output can have several causes, including dirt, new shading or equipment faults. Comparing current readings with earlier performance helps identify what needs attention before repair or replacement is proposed.
Maintenance frequency depends on site conditions, dust exposure and equipment guidance. Ask for the visit scope, any parts required and the expected charges. For warranty enquiries, keep your invoice and equipment serial numbers available.
Explore this serviceRequest a Solar Installation or Service Quotation
Send your city, latest electricity bill and a short description of the work required. For backup enquiries, include essential appliances and desired running time. For maintenance, add the system age, equipment details and fault symptoms.
Installation cost depends on equipment, roof structure, wiring, battery storage and site work. Request an itemised quotation that explains supply, labour, testing, application support and after-sales terms.
Call Japston Energy on 03439595658 or 042-36661512. You can also email connect@japstonenergy.com to discuss solar installation, battery backup and maintenance services anywhere in Pakistan.
FAQs
Do you provide solar installation services outside Lahore?
Yes. Japston Energy serves homes, businesses, factories and farms across Pakistan. Share your city and site details to discuss installation requirements.
How can I get a solar installation quotation?
Send your latest electricity bill, location and equipment requirements. Mention whether you need battery backup. The quotation depends on system capacity, equipment and site work.
Can I add battery backup to my existing solar system?
This depends on your inverter and system design. Share the inverter model so compatibility, battery capacity and any wiring changes can be assessed.
What information is needed for solar net metering support?
Share your city, electricity provider, proposed system capacity and any existing application reference. Our team can discuss the paperwork and support required for your case.
How often should my solar system be serviced?
Service frequency depends on dust, shading, equipment guidance and system performance. Request an inspection if output drops unexpectedly or the inverter shows repeated fault alerts.
